<br><font size=2 face="sans-serif">Hi all,</font>
<br><font size=2 face="sans-serif">Thanks again for your kind support for my previous queries</font>
<br>
<br><font size=2 face="sans-serif">Here is one more query</font>
<br><font size=2 face="sans-serif">I'm using Continuus CM v5.1</font>
<br><font size=2 face="sans-serif">I've one released project say A~1.0 with release R1.0</font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; I want to derive prep project B~2.0 with Release R2.0</font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; And I want to take project B as baseline for project C~2.0 with release R2.0 ( project B is still in prep state)</font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; Two different teams will be working on project B and C</font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; Two build managers will manage the projects B and C</font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; </font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; Reconfigure template for both project B and C is same ( release value and baseline)</font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; </font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; I'm expecting that task completed for project B and C are available in project C and B respectively when projects are reconfigured</font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; </font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; Do you visualize any problem in this?</font>
<br><font size=2 face="sans-serif">&nbsp; &nbsp; &nbsp; &nbsp; Is there is any probelm if project B and C released at different point of time?</font>
<br>
<br><font size=2 face="sans-serif">Regards,<br>
Mohan<br>
</font>