<br><font size=2 face="sans-serif">We do use prep projects as baselines,
we call these baselines the BASE project, they are reconfigured to the
baseline of whichever release we would like to use. </font>
<br><font size=2 face="sans-serif">For the prep baselines to show up in
the baseline select dialog, you need to set the "allow_prep_baselines"
keyword to true.</font>
<br>
<br><font size=2 face="sans-serif">One problem I see here is the reconfigure
templates, only CMSynergy 6.3 allows prep baselines in reconfigure templates,
the previous versions do not.</font>
<br>
<br><font size=2 face="sans-serif">Also, remember to use different 'project
purpose' for the prep projects B and C which are for the same release,
otherwise you'll run into problems with 'products' and 'subprojects' because
those will be associated to the same automatic tasks.</font>
<br>
<br><font size=2 face="sans-serif">Regards,</font>
<br><font size=2 face="sans-serif">Pradeep<br>
</font>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td>
<td>
<br>
<br>
<br>
<br>
<br><font size=1 face="sans-serif"><b>mohan_tarole@chennai.tcs.co.in</b></font>
<p><font size=1 face="sans-serif">Sent by: </font>
<br><font size=1 face="sans-serif">opencm-bounces@armory.com</font>
<p><font size=1 face="sans-serif">06/06/2003 05:05 AM</font>
<br><font size=1 face="sans-serif">Please respond to Open CM Mailing List</font>
<td><font size=1 face="Arial"> </font>
<br><font size=1 face="sans-serif"> To:
opencm@armory.com</font>
<br><font size=1 face="sans-serif"> cc:
(bcc: Pradeep George/SVL/SC/PHILIPS)</font>
<br><font size=1 face="sans-serif"> Subject:
[OpenCM] prep project as baseline</font>
<p><font size=1 face="sans-serif"> Classification:
</font>
<br></table>
<br>
<br>
<br><font size=2 face="sans-serif"><br>
Hi all,</font><font size=3> </font><font size=2 face="sans-serif"><br>
Thanks again for your kind support for my previous queries</font><font size=3>
<br>
</font><font size=2 face="sans-serif"><br>
Here is one more query</font><font size=3> </font><font size=2 face="sans-serif"><br>
I'm using Continuus CM v5.1</font><font size=3> </font><font size=2 face="sans-serif"><br>
I've one released project say A~1.0 with release R1.0</font><font size=3>
</font><font size=2 face="sans-serif"><br>
I want to derive prep project B~2.0 with Release
R2.0</font><font size=3> </font><font size=2 face="sans-serif"><br>
And I want to take project B as baseline for
project C~2.0 with release R2.0 ( project B is still in prep state)</font><font size=3>
</font><font size=2 face="sans-serif"><br>
Two different teams will be working on project
B and C</font><font size=3> </font><font size=2 face="sans-serif"><br>
Two build managers will manage the projects
B and C</font><font size=3> </font><font size=2 face="sans-serif"><br>
<br>
Reconfigure template for both project B and
C is same ( release value and baseline)</font><font size=3> </font><font size=2 face="sans-serif"><br>
<br>
I'm expecting that task completed for project
B and C are available in project C and B respectively when projects are
reconfigured</font><font size=3> </font><font size=2 face="sans-serif"><br>
<br>
Do you visualize any problem in this?</font><font size=3>
</font><font size=2 face="sans-serif"><br>
Is there is any probelm if project B and C
released at different point of time?</font><font size=3> <br>
</font><font size=2 face="sans-serif"><br>
Regards,<br>
Mohan</font><font size=2><tt>_______________________________________________<br>
OpenCM mailing list<br>
opencm@opencm.net<br>
http://www.armory.com/mailman/listinfo.cgi/opencm<br>
</tt></font>
<br>